Location of Project: Blue Ridge, GA
On this project, we carefully backfilled around a crawl space and, during the same trip, installed over 310 feet of fill lines for a 1,000-gallon septic tank. The weather made things challenging—we had to start and stop the job since septic systems can’t be installed in wet conditions. But with constant communication and planning ahead, we were able to get it done on time.